Construction & infrastructure · 7 min read
Most bad contractor experiences were visible before the contract was signed. This checklist shows where to look.
Before hiring an interior or exterior works contractor, check four things: that the quote matches your drawings, that the contractor has finished comparable work you can visit, that the payment terms follow progress, and that the contract says in writing how changes and delays are handled. Most of the problems owners report later, such as overruns, poor finish and abandoned sites, show up as warning signs at this stage.
This article lists the common mistakes, the red flags worth taking seriously, and a checklist you can work through before you commit any money. It is general guidance and not a substitute for advice on your specific contract.
The first mistake is hiring on price alone. A quote that is far below the others usually leaves something out, whether it is services work, protection of finished surfaces, debris removal or a realistic labour allowance. The gap tends to reappear later as a variation.
The second is starting without drawings. Without drawings, the contractor decides what you get, and you decide what it costs only after the fact. The third is paying a large advance with nothing tied to progress. A big upfront payment removes the contractor's reason to finish and leaves you with little leverage if the pace drops.
Other frequent mistakes include accepting verbal promises, not checking who will actually supervise the site, ignoring the landlord's or society's rules, and changing the design after work has started.
Read the quote line by line. These are the signs that deserve a question.
A good quote refers to your drawings, lists items with quantities, states what is included and what is not, and names the materials. If the quote cannot be matched to a specific drawing, ask the contractor to revise it.
Ask for the contractor's recent finished projects and visit at least one. Look closely at joints, edges, door alignment, ceiling lines and how the electrical fittings sit. Photographs hide what a visit shows. Speak to the owner of that site, not just the contractor's chosen reference, and ask whether the work finished on time and how disputes were settled.
Be careful if the contractor is reluctant to show finished work, avoids written terms, or cannot name the person who will supervise your site. Also be careful if most of the work will be handed to unnamed sub-contractors. Sub-contracting is common and not wrong in itself, but you should know who does the electrical, plumbing and carpentry work, and that those people are competent for the job.
Check licences and insurance for specialist work
Electrical, air conditioning and fire safety work generally must be done by competent, suitably authorised people, and your building or landlord may require proof. Ask the contractor to show the relevant authorisations and any insurance for workers and for the site. Confirm the requirements with the competent local authority and your landlord, because they vary.
Before you sign, collect a small file of papers. It protects you and helps if you later need to show the project cost to a lender or an insurer.
A contractor can interview well and still slip during execution, so keep a routine. Visit regularly, take dated photographs, and compare what you see with the drawings. Pay particular attention to things that get covered up, such as pipes inside walls, wiring behind ceilings and waterproofing layers. Ask to see these before they are closed, and have your designer or a consultant inspect them if you are not confident.
Check that the materials delivered match the specification. Ask for samples to be approved in writing and keep them on site for comparison. When a substitute is proposed because the specified item is not available, require the change in writing with the price effect stated.
Keep payments aligned with measured progress. If the contractor asks for money without matching progress, pause and discuss it before paying.
Put quotes side by side only after you have made them comparable. Send every contractor the same drawings, the same specification and the same item list, and ask each one to price against them. Quotes built on different assumptions cannot be compared, however neat they look.
Then read the gaps. Make a simple sheet with one row for each item and one column for each contractor, and mark where an item is missing, covered by a lump allowance or described differently. A missing item is not a saving, it is a question. Ask the contractor to confirm in writing whether it is included and at what cost.
Finally, compare the people as well as the price. Note who replied promptly, who asked sensible questions about your site and who pointed out problems in your drawings. A contractor who finds gaps before the contract is signed is usually more careful than one who agrees to everything.
Agree the payment schedule before the work begins, and tie each stage to something you can see or measure, such as completion of ceilings, carpentry or surface preparation for painting. Keep a part of the payment back until the defects period ends, and check current practice with your advisor.
Handle changes in writing. When you want a change, ask the contractor for the price and time effect before approving it, and sign the order before the work proceeds. Many disputes begin with a casual instruction on site that nobody recorded.
At handover, walk through the site with a written snag list, which is a list of defects and unfinished items. Photograph each point, agree a date for fixing it and keep the final payment linked to that list. Collect warranties, product details and drawings that show where concealed pipes and wires run.
Work through these questions in order.
If any answer is no, fix it before work begins, not after.
Use the checklist on your next quote this week and note every item the contractor cannot answer. Those gaps show you where the risk sits. If you want a second pair of eyes on your quotes or contract, Lalsar Infra can review your case.
Key terms
Questions
Several comparable quotes give you a fair view of the market, and three is a common practical choice. What matters more than the count is that every quote is based on the same drawings and item list, so the comparison is real.
There is no single right figure. A modest advance to start procurement is common, but later payments should follow measured progress. Be wary of large upfront payments, and agree the schedule in writing before you pay anything.
Start by writing to the contractor, citing the agreed programme and asking for a date to resume. Document the work done and the payments made. Get legal advice on the contract terms if the delay continues, and avoid paying more until the position is clear.
A recommendation is a good starting point, not a substitute for checks. Still visit the work, read the contract and compare the quote against drawings. Personal trust is far safer when it is backed by clear paperwork.
The contract should state a defects period during which the contractor must fix faults at their own cost. Ask for the period and the process in writing, and keep the snag list and handover documents safe in case you need to refer to them.