Interior & Exterior Works · Question
Short answer
Walk the finished space with the signed scope, drawings and item list in hand, checking each area for finish quality, alignment, fit and operation of fittings, working of electrical and plumbing points, cleanliness and missing items. Record every defect in writing with photographs, agree who fixes what and by when, and keep some payment aside until the list is closed.
Handover is the last easy moment to ask for corrections, because after acceptance the burden of proof tends to shift. Allow enough time, ideally in daylight, and bring the people who will use the space.
Start with the big picture, then look closely. Compare the layout against drawings: partitions, openings, ceiling heights and counter positions. Then check surfaces at close range.
A methodical walkthrough covers these groups:
Switch on every light and open every door and drawer. Use the room as a customer or staff member would.
A small catch that mattered
During a showroom handover, the owner tried every drawer and found two that scraped against the carcass. Because the item was written into the defect list before final payment, the contractor corrected it without argument.
Also collect the documents: warranties, product details, as-built drawings where relevant, keys and operation guidance. Write the date and attendees on the inspection record, and have both sides sign.