Construction & infrastructure · 7 min read
Most construction disputes trace back to things that were never asked or never written down. These questions and checks help you settle them before work begins.
Before you sign with a civil contractor, ask about their relevant experience, who will actually supervise your site, how they price and handle changes, how they manage quality and safety, and what happens if the work is late or defective, and get every answer into the contract. The lowest quotation is rarely the lowest final cost. A contractor who answers these questions clearly and in writing is usually easier to work with than one who avoids them.
This checklist is general guidance for owners. It does not replace advice from your architect, engineer or lawyer, and it does not set any technical standard. Work is expected to follow applicable codes and local requirements, and your designers and the competent authority decide technical and regulatory questions.
Start with who you are dealing with. A quotation is only as reliable as the firm behind it.
Ask for a short profile: how the firm is constituted, how long it has worked, what kinds of projects it has handled and which similar ones it has completed. Ask to visit a finished project and a running site, and speak to those owners directly. A contractor who is confident in their work will usually agree.
Ask about the team. Who will be the site engineer, the supervisor and the foreman, and will they be present full time? Many problems come from a capable firm sending an inexperienced team to your site.
Ask about finances, in general terms. Can they fund materials and wages between your payments? A contractor under cash stress may slow down, cut corners or leave the job. Ask for references from suppliers and check that the firm is registered where the law requires, with current tax registrations.
Comparing quotations is only fair if each one prices the same scope. Give all bidders the same drawings, specifications and bill of quantities, which is the itemised list of work with estimated quantities.
Then look for what differs. One bid may exclude site clearing, another may leave out waterproofing, a third may assume cheaper materials. A low price often means a narrow scope that will expand later through variations, which are extra charges for work not in the original price.
Ask each bidder:
Ask how quality will be controlled, not just promised. Who checks reinforcement and formwork before concrete is poured? How are material tests arranged, and who keeps the records? Will the structural engineer or an independent supervisor inspect critical stages, and how will you be told?
Ask how safety will be managed on site. Workers need appropriate protective equipment, safe access and supervision, and neighbours and passers-by must be protected. Ask what insurance cover applies to workers and to third-party damage. Requirements differ by project and location, so confirm what applies.
A good answer is specific. A weak answer is a general assurance that everything will be fine.
A written contract is your main protection. Do not begin on a handshake. Read the whole document, and have a lawyer review it for a larger project. It should cover at least these points.
Some owners also ask for a performance security from the contractor, sometimes in the form of a bank-issued undertaking, which is a written promise from the contractor's bank to pay if the contractor fails to perform. Whether this is appropriate depends on the size of the project, so discuss it with your adviser.
| Warning sign | What to do |
|---|---|
| Price far below the others | Check scope and materials line by line; ask what has been left out |
| Asks for a large advance | Seek advice; tie any advance to documented mobilisation and recover it from bills |
| Reluctant to put things in writing | Treat it as a serious concern and insist on a written contract |
| No site team named | Ask who will supervise, and make named staff part of the contract |
| Pressure to start before approvals | Wait for the permissions the competent authority requires |
| Cannot show past work or references | Ask for visits and calls, or look elsewhere |
Do not start work before approvals
Starting construction before the competent authority has approved your plans can lead to stop-work orders, penalties or forced changes. Whatever the contractor says about timing, confirm what permissions your project needs and obtain them first.
The checklist is not only for the contractor. Ask whether you have a clear brief and a settled budget, whether the drawings are final enough to price, whether you can pay on time, and whether you have someone, such as an engineer or architect, to inspect and certify progress on your behalf. Delays in decisions and payments cause disputes just as often as contractor failings.
A quotation that looked cheap
An owner chose the lowest of three quotations for a small industrial building. The contract excluded site levelling and drainage, used a lower grade of finishing than the others and left several items as provisional. By the end, the extras had closed the gap with the other bids, and the quarrel over scope delayed completion. Comparing scope first would have shown the difference at the start. This is a hypothetical illustration.
Turn this article into your own checklist, ask each contractor the same questions, and record the answers. Choose the firm that is clear, consistent and open about what it will and will not do. If you want a second pair of eyes on your quotations or contract, Lalsar Infra can review your plan with you.
Key terms
Questions
No. Compare scope, materials and the contractor's record before price. A low bid can reflect a narrower scope or weaker finances, and extras later may remove the saving. Choose the quotation that is clear, complete and credible, not merely the lowest.
Practices differ, and the right figure depends on the project and the contract. Keep any advance modest, document it, tie it to mobilisation and recover it from later bills. Seek advice for larger contracts, and avoid paying far ahead of work done.
The contract should say. It usually sets out the completion date, the grounds for extension and any compensation for avoidable delay. Keep a written record of delays and their causes, because responsibility is often shared and records settle disagreements.
For larger or more technical projects it is usually wise. An independent engineer or architect checks quality, certifies progress for payment and speaks for your interests on site. For small jobs, you may manage with regular visits, but still ask someone qualified to inspect critical stages.
Do not accept changes verbally. Ask for the reason, the effect on cost and quality, and the designer's view. Any change should be approved in writing before it is carried out, and the price adjusted if appropriate.