Painting Contracts · Question
Short answer
Putty fills pinholes and small surface flaws so the wall becomes smooth and even, while primer seals the surface and gives the final paint something to grip. Without them the paint soaks in unevenly, shows every blemish, peels earlier and needs more coats. Preparation layers are what make the visible coats look good and last.
Plastered walls look finished, but at close range they are rough, porous and slightly uneven. Final paint is a thin film that follows whatever is underneath it.
Putty, also called wall putty or skim coat, is a fine cement-based or acrylic-based filler applied in thin layers and smoothed. It evens out pinholes, trowel marks and minor undulations. It also provides a uniform, light base, which helps colours look true. Done well, it is the main reason a wall appears flat under side light.
Primer is a thin coat that does different work. It seals the porous surface so the topcoat is not absorbed unevenly, helps the paint to bond, blocks alkali that can attack the finish, and can resist dampness or stains, depending on the type. Different surfaces need different primers: one for new plaster, another for putty, another for metal or old gloss. Using the wrong primer can be as bad as none.
What goes wrong without them:
Check the layers appear in the contract
Quotations that list only paint coats may leave out putty and primer, which explains some low prices. Ask for the number of putty coats, the primer type and the topcoat system in writing, and for the manufacturer's recommended system to be followed.
Expect the contractor to allow drying time between layers and to sand lightly between them. If one day produces the whole job on a wall, the layers were probably rushed. Treat the cost of these layers as part of the finish, not an extra.