Demolition & Site Clearance · Question
Short answer
A pre-demolition survey is a documented inspection of a building and its surroundings before any structure is touched. It records the construction type, services, hazardous materials, neighbouring properties and access, so the contractor can plan the method, price realistically and protect people and property. Skipping it is a common reason for accidents, delays and cost disputes.
Old buildings hide surprises. Walls that look ordinary may carry loads that tie into the neighbouring structure. Pipes and cables may still be live. Roof sheets or insulation may contain materials that are harmful when broken. A survey brings these facts to the surface while changing the plan is still cheap.
What a competent survey usually covers:
The findings guide the choice between manual, mechanical or sequenced methods, the order of work and the protection needed. They are not for the owner to carry out alone. Qualified professionals should do the inspection and the method statement, in line with applicable codes and any permission the competent authority requires.
Make the survey part of the contract
Ask each bidder to state what they surveyed, what they assumed and what they excluded. A quote based on a quick glance can rise sharply once hidden conditions appear, and the survey report gives both sides a fair baseline.
The record of neighbouring conditions also protects you. If a crack is later alleged to have been caused by the demolition, dated photographs from before the work are far stronger than memory.