Short answer
Planners usually receive water from the municipal or other source into an underground sump, then pump it to overhead tanks that feed the building by gravity or through a pressure arrangement. The split between the two depends on daily water use, supply reliability, building height and any separate allowance for fire-fighting, so a qualified plumbing designer should size both.
The underground sump acts as the first buffer. Water arrives when the source supplies it, which may be only at certain hours, and the sump holds it until needed. Pumps then lift water to tanks on the roof or an upper level. From there it flows down through risers to taps, fixtures and equipment.
Why two stages? Supply from the source is rarely matched to demand hour by hour. The sump absorbs irregular arrival, and the overhead tanks keep the building running during pump maintenance or power interruption. The designer weighs how much should sit at each level, how many separate compartments are needed so cleaning does not stop all supply, and how drinking, flushing and process water are to be kept apart.
| Factor | Why it matters |
|---|---|
| Occupancy and use | Offices, canteens and process units draw water very differently |
| Source reliability | Irregular supply calls for a larger buffer at the sump |
| Building height | Taller buildings often need intermediate tanks or pumped zones |
| Fire-fighting needs | Dedicated storage is usually kept separate, as set by local rules |
For the owner, the practical questions are structural and spatial. Tanks are heavy, so the structural designer must know their location early. Sump size affects excavation and the basement layout, and access for cleaning must be built in from the start.
Settle it at drawing stage
Storage volume and tank locations are hard to change once slabs are cast. Raise them with the architect, structural engineer and plumbing designer together, before the drawings are finalised.
Capacities and arrangements follow applicable codes and the local authority's requirements, so ask the designer to state the basis in writing.