Short answer
Start from the product path, not the building outline. Map each step from raw material receipt through processing, packing and dispatch, then arrange spaces so the flow is short, mostly one-directional and free of crossings. Give storage, staging and movement space their own zones, and share your process chart with the architect before the footprint is drawn.
A factory building is a container for a process, so the layout should follow it. List the steps in order, note what moves between them, in what form, how often and with what equipment, such as pallet trucks, forklifts, trolleys or conveyors.
From this, sketch a flow diagram without worrying about walls. You are looking for a line that runs from input to output with minimal backtracking. Where flows cross, such as finished goods meeting incoming material, congestion and accidents become likely.
Next assign zones. Typical ones are receiving and inspection, raw material store, processing lines, work-in-progress buffers, packing, finished goods store and dispatch, plus separate spaces for maintenance, utilities, waste and staff. Keep buffers close to the machines they serve, and keep heavy or frequent movements short.
Walk the plan with your supervisors
Ask the people who handle material daily to trace a typical batch on the drawing. They often spot bottlenecks a designer will not see.
Share the equipment list, machine sizes, service needs and expected volumes with the designer, and review the layout again whenever the machine list changes.