PEB (Pre-Engineered Building) Construction · Question
Short answer
Yes. Pre-engineered buildings are designed against site-specific loads, and wind, rain drainage and similar actions are part of that design for the location you provide. Exposed, coastal or storm-prone sites call for more careful engineering, so give the supplier your exact location and ask them to confirm the design basis in writing.
Because each building is designed individually, the engineer looks at where it stands, how tall and open it is, and what surrounds it. Wind pressure acts differently on a tall building with large openings than on a low closed one, and an open site behaves differently from one sheltered by other structures.
Design is performed under the applicable national codes for that location. The engineer, not the buyer, selects the actual values, and the buyer should not try to specify them casually. What the buyer can do is supply accurate information and ask to see the design basis.
Ask for a design basis statement
A short document stating the loading standards, location data and any special assumptions makes it easy to compare suppliers and to review the design with an independent engineer.
Rainwater is a separate concern from structural load. Drainage must be sized and detailed so water leaves quickly, and the sheeting details must keep water out. Both depend on workmanship as much as design.
Last reviewed
This answer is general information, not advice on your particular case. Terms, eligibility, and requirements change, so check the current position with the relevant institution or authority.