PEB (Pre-Engineered Building) Construction · Question
Short answer
Often yes, but not without proper investigation. A pre-engineered building is relatively light, yet it still transfers concentrated loads to the ground at each column. On weak or filled soil, a structural engineer must study the ground first and design a foundation that suits it, which may be deeper, wider or supported differently than on firm ground.
The steel frame is only half the story. Its columns pass forces into foundations, and the foundations depend wholly on what lies beneath. Filled land is especially tricky because the fill may be uneven, poorly compacted or contain unsuitable material, so strength can change from one corner of the plot to another.
A soil investigation, normally carried out by a qualified geotechnical agency, tells the designer what the ground can carry and how it may settle. Without it, the foundation is a guess, and corrective work after construction is expensive and disruptive.
The foundation designer may recommend improving the ground, replacing unsuitable fill, using deeper or larger footings, or adopting a different foundation system altogether. Which route is sensible depends on the report, the building loads and the cost, and the choice rests with the engineer responsible.
Do not let the frame supplier assume the ground
If the quote says the foundations are by others, confirm who designs them and which soil data they use. A supplier's anchor bolt layout is only reliable if the foundation design matches it.
Plan for the investigation early, because its results can change both budget and schedule. Ask the engineer to explain any assumptions about groundwater, compaction of fill and nearby structures. Local authorities may also have requirements for filled or low-lying plots, so check with the competent authority.